Skip to main content
RCDEN
SystemsServicesPartnersNewsAboutAssuranceContactInvestor information
Start a project ↗
RCDEN // NavigationMobile / Active
←Back to RCDEN
01Systems↗02Services↗03Partners↗04News↗05About↗06Assurance↗07Contact↗08Investor information↗
Start a project↗
  1. Home
  2. Policies
  3. Supplier guide
  4. P Product origin and traceability

Supplier registration

Your guide to the form.

—Before you start01Start the registration02Company details and ownership03Security contact and clearances04Current cyber assurance05Information handling and secure design06Export controls and sanctions07Ethics and statutory statements08Insurance and financial standing09Quality and goods assurance10Data protection11Exceptions and evidence12RCDEN’s registration review13Agreement and signaturesAWork-specific addendumPProduct origin and traceabilityiSupplier privacy notice

Use the copy issued to your company. This website provides guidance; supplier documents are supplied directly by RCDEN.

Choose a section +
—Before you start01Start the registration02Company details and ownership03Security contact and clearances04Current cyber assurance05Information handling and secure design06Export controls and sanctions07Ethics and statutory statements08Insurance and financial standing09Quality and goods assurance10Data protection11Exceptions and evidence12RCDEN’s registration review13Agreement and signaturesAWork-specific addendumPProduct origin and traceabilityiSupplier privacy notice

Section P / For identified goods

Issued form · pages 12–13

Product origin and traceability

Confirm what is being bought, where it comes from and the evidence supporting the agreed sourcing requirements.

When this applies

Use Part P when RCDEN requests assurance for identified goods, including internal-use equipment. RCDEN completes P.2 before supplier acceptance; the supplier completes P.3–P.5 and RCDEN records the decision in P.6. Services-only registration does not require a product schedule.

Help with this section

Open a question for help. The numbers match the printed questions and agreement clauses.

P.1(a)

Master agreement and Part P reference / revision

+

What to enter

Copy the master agreement reference and assign a Part P identifier and revision for these goods. Use a referenced continuation for a product list.

Link to question P.1(a) ↗Your issued form · page 12
P.1(b)

Supplier legal name and affected orders / item lines

+

What to enter

Identify the supplying legal entity and the affected order or proposed order item lines. Part P may cover scanners or other equipment bought for RCDEN’s own operations.

Link to question P.1(b) ↗Your issued form · page 12
P.2(a)

Finished-product scope and prohibited PRC connections

+

What to enter

RCDEN states the goods, countries and links excluded: actual origin, manufacture/final assembly, ownership or control, and any other expressly specified connection. Include RCDEN internal-use products where required. This is an RCDEN purchasing requirement, not a blanket MOD rule. Do not treat brand headquarters or shipping location as origin evidence.

PRC means the People’s Republic of China. RCDEN must state the relevant territorial and ownership/control tests expressly; suppliers must not assume that “non-Chinese” has a settled technical definition. Here “excluded links” means prohibited sourcing connections.

Link to question P.2(a) ↗Your issued form · page 12
P.2(b)

Components / assemblies: required depth, BOM references and excluded links

+

What to enter

RCDEN defines component and assembly depth, relevant BOM references, excluded PRC links and evidence criteria before supplier acceptance. Do not silently limit checks to critical components or assume omitted components are excluded. Unresolved depth or unavailable evidence remains unapproved.

Link to question P.2(b) ↗Your issued form · page 12
P.2(c)

Software / firmware, cloud / support and provider ownership or control

+

What to enter

Record embedded software and firmware, associated cloud and remote support, provider locations and ownership/control within the purchasing restriction. RCDEN expressly identifies any agreed exclusions and the authority permitting them; the supplier cannot self-waive them.

Link to question P.2(c) ↗Your issued form · page 12
P.2(d)

RCDEN source requirements, applicability review and scope authoriser / date

+

What to enter

Identify source document, clause, edition/date, applicable scope and evidence criteria; record RCDEN issue authoriser/date. Reference controlled records using an authorised route; do not attach private client terms to a public guide. Unresolved applicability prevents affected order acceptance or activity until resolved.

Link to question P.2(d) ↗Your issued form · page 12
P.3(a)

OEM, model / part and hardware / firmware versions

+

What to enter

Identify the actual OEM legal entity, product model, part number, hardware revision and software/firmware version as applicable. Identify the relevant order item for each entry; use a referenced continuation for multiple products.

Link to question P.3(a) ↗Your issued form · page 12
P.3(b)

Actual country of origin and final assembly country

+

What to enter

State actual origin separately from final assembly. Specify the basis, applicable origin rules where relevant, evidence and any uncertainty. Branding, distributor address and shipment country alone do not establish origin.

If a country code is required, give the country name as well. State the basis for the origin claim and separate any assembly location. An origin determination for the finished item does not establish every component’s origin.

Link to question P.3(b) ↗Your issued form · page 12
P.1(c)

Repeated master and Part P references

+

What to enter

Repeat the master and Part P references on page 13. Keep both pages and all referenced evidence together.

Link to question P.1(c) ↗Your issued form · page 13
P.4(a)

Manufacturer-backed origin evidence and relevant conformity evidence

+

What to enter

Identify issuer, document/date, product scope and verification route. Use manufacturer-backed declarations or equivalent product-specific evidence; state exactly what each document proves. Conformity certificates are required only where applicable law or the agreed product scope requires them. No certificate proves every origin or sourcing condition.

Where to find it / what to do next

  1. Ask the OEM or authorised distributor for evidence covering the exact part or model and relevant production period.
  2. Check issuer, date, product identifiers and any qualifications. Confirm doubtful documents through the manufacturer’s established contact route.
  3. For applicable radio equipment, check the declaration of conformity covers the supplied configuration and intended market. This is separate from origin and non-PRC evidence.

Useful external help

Opens in a new tab so you can keep this question open.

  • Country of origin and the applicable rules ↗ (opens in a new tab)HMRC

    Origin may differ from the country of purchase or shipment; use the applicable rules for the claim being made.

  • Radio Equipment Regulations: Great Britain ↗ (opens in a new tab)Office for Product Safety and Standards

    Manufacturer, importer and distributor duties for radio equipment placed on the Great Britain market.

If you are still unsure

Record which evidence is missing in P.5(a). The manufacturer may be able to give a scoped declaration without disclosing a proprietary bill of materials; RCDEN must decide whether that meets the recorded criteria.

Link to question P.4(a) ↗Your issued form · page 13
P.4(b)

Supply-chain and serial / batch / lot / invoice traceability

+

What to enter

Connect supplied items to the OEM or authorised channel and applicable evidence. Record serial, batch or lot identifiers where used; where none exists, use appropriate delivery or invoice references. These identify the supply but do not establish country of origin or complete component provenance. Retain specified product conformity, provenance and traceability records for six years after supply, or longer where law or the expressly agreed order requires, minimising personal data. Identify evidence limits.

Link to question P.4(b) ↗Your issued form · page 13
P.4(c)

Component, software and service evidence against P.2

+

What to enter

Map evidence to the agreed component depth and all covered firmware/software, cloud/support, location and ownership/control conditions. Reference a BOM or evidence matrix where useful. Do not disclose sensitive detailed architecture through an unapproved route.

For connected equipment, include relevant update and vulnerability-support arrangements, support lifetime and remote-service dependencies within the requested scope. Do not demand internal architecture or a full software bill of materials unless the requirement calls for it.

Link to question P.4(c) ↗Your issued form · page 13
P.5(a)

Known PRC links, unknowns, evidence gaps and proposed exceptions

+

What to enter

List each known covered PRC connection, unverified source, unavailable evidence, unresolved requirement and proposed exception. State affected item, impact and proposed resolution. Unknown or unavailable information is not an approval. Only express RCDEN approval with any necessary customer authority can accept an exception; law cannot be waived.

Link to question P.5(a) ↗Your issued form · page 13
P.5(b)

Supplier confirmation and authorised signature

+

What to enter

Confirm reasonable enquiry and accurate, non-misleading evidence with limitations declared. Sign to agree the recorded requirements subject only to expressly accepted departures. This declaration is not RCDEN acceptance and does not authorise supply.

Link to question P.5(b) ↗Your issued form · page 13
P.6(a)

RCDEN product assurance decision

+

What to enter

RCDEN records approval only for an identified, evidenced scope, with necessary authorities established. Keep affected ordering or supply on hold while scope, unknown provenance or evidence gaps remain unresolved. A recorded exception needs express written RCDEN approval and any necessary customer authority.

Link to question P.6(a) ↗Your issued form · page 13
P.6(b)

Evidence review, authorised exception references and release conditions

+

What to enter

Identify evidence reviewed, outstanding conditions and approval or exception references, including customer authority where necessary. Conditions must not be used to authorise an unresolved prohibited activity. Separate registration, contract acceptance and controlled-activity approvals remain necessary.

Link to question P.6(b) ↗Your issued form · page 13
P.6(c)

RCDEN authorised reviewer and decision date

+

What to enter

Identify reviewer, role and date. Approval is confined to the recorded product configuration and scope. Through agreed change control, obtain required written approval for substitutions or material changes affecting agreed specification, sourcing or security restrictions, or approved supply arrangements. Ordinary compliant maintenance or security updates are not automatically prohibited.

Link to question P.6(c) ↗Your issued form · page 13

If more detail is needed

For the relevant work only. These are not extra questions in the initial registration.

For a barcode or RFID scanner, what is normally useful?+

Start with the precise model and manufacturer, product-specific origin evidence, authorised supply route and serial or batch information. For radio equipment, ask for the applicable declaration of conformity and confirm the regional radio configuration. Ask about supported firmware, update delivery, end of support and any cloud or remote-support dependency where relevant to the intended use.

An ordinary reseller need not create an aerospace quality system simply to quote for scanners. It must still disclose evidence gaps and meet the actual sourcing, product and contractual requirements before the affected supply is approved.

How to use the addendum →
What does RCDEN need to retain after approval?+

Record the purchase order and line, supplier, OEM/model/part, delivered serial/batch/lot identifiers and references to the approved evidence. Check the delivered configuration against the approval and hold unexpected substitutions for review.

If an item is incorporated into another product, link the received item or batch to RCDEN’s bill of materials, build record and outgoing serial or delivery record. An onboarding questionnaire cannot create that downstream traceability by itself.

How to use the addendum →
Are country codes, commodity codes and certificates the same?+

No. Record the country name and a country code if the order or system requires one. A customs commodity code classifies the goods; it does not identify origin. A certificate of origin, conformity declaration and manufacturer declaration each have different purposes and scope. Check what the actual document establishes.

How to use the addendum →
Before you move on

A UK reseller, a non-Chinese brand or a country code alone does not prove absence of PRC technology. Unresolved scope, provenance or evidence stays on hold. Approval covers only the identified configuration and requirements; keep records linked through receiving and any later build.

Have these ready

  • The exact OEM, model, part number and relevant configuration.
  • Manufacturer-backed origin and applicable conformity evidence.
  • Supply-channel and delivery traceability references.
  • The scope and evidence criteria issued by RCDEN in P.2.

Further reading

Start with the practical help beside each question. These official sources explain the underlying rules if you need more detail.

HMRCCountry of origin and the applicable rules↗ (opens in a new tab)Office for Product Safety and StandardsRadio Equipment Regulations: Great Britain↗ (opens in a new tab)MODCyber Security Model — applicability and assurance↗ (opens in a new tab)

The signed agreement and identified work-specific schedules determine the obligations. Official guidance explains their legal or contractual basis.

When to use an addendum →
← PreviousA Work-specific addendumReturn to guide →All sections

This guide explains form v2.2. It does not amend the issued requirements or approve work, exceptions or information release. Use the external help to find records and understand the rules. For questions about RCDEN's requirements or the proposed work, use the contact in Section 1.2 and quote the question number.

RCDEN

RCDEN | INTELLIGENT UNMANNED SYSTEMS

sales@rcden.co.uk ↗
Follow RCDENLinkedIn ↗ (opens in a new tab)Facebook ↗ (opens in a new tab)
THE RC DEN LTDRegistered in England and Wales · Company no. 14639255Customer-facing workshop: Unit 8, Blackwood Court, Teal Park, North Hykeham, Lincoln, LN6 3AERegistered office: Unit 8 Blackwood Court, Lincoln, England, LN6 3AE
HomeServicesTechnology partnersAboutAssuranceNewsEngineering resourcesRSS updatesPoliciesContactInvestor informationBrand guidePrivacy & cookies

Supplier guidance · Form v2.2 · Reviewed 18 September 2026

© 2026 THE RC DEN LTD