Supplier registration

Your guide to the form.

—Before you start01Start the registration02Company details and ownership03Security contact and clearances04Current cyber assurance05Information handling and secure design06Export controls and sanctions07Ethics and statutory statements08Insurance and financial standing09Quality and sub-tier duties10Data protection11Exceptions and evidence12RCDEN’s registration review13Agreement and signaturesAWork-specific addendum

Use the copy issued to your company. This website provides guidance; supplier documents are supplied directly by RCDEN.

Choose a section +
—Before you start01Start the registration02Company details and ownership03Security contact and clearances04Current cyber assurance05Information handling and secure design06Export controls and sanctions07Ethics and statutory statements08Insurance and financial standing09Quality and sub-tier duties10Data protection11Exceptions and evidence12RCDEN’s registration review13Agreement and signaturesAWork-specific addendum

Section 09 / Supplier completes

Issued form · page 5

Quality and sub-tier duties

Record quality certificates held. Agree additional quality requirements only for the work they cover.

When this applies

ISO 9001, AS/EN 9100 and AQAP duties are not interchangeable. Certification is not a universal condition of initial registration.

Help with this section

Open a question for help. The numbers match the printed questions and agreement clauses.

9.1

Current certification

+

What to enter

Select all schemes currently held, or None. For Other, identify the scheme. Give a current certificate or verification reference. If certification is pending, do not describe it as held; explain any relevant limitation in 11.1.

Where to find it / what to do next

  1. Check the certificate held by your quality lead or certification provider. Confirm the named entity, standard, scope and current status.
  2. If a copy is missing, request it from the body that issued it. ISO develops standards; certificates are issued by certification bodies.
  3. If no certification is held, select None. A quality procedure or a planned assessment is not a certificate.

Useful external help

Opens in a new tab so you can keep this question open.

  • Understand and verify ISO certification ↗ (opens in a new tab)ISO

    Explains certification and accreditation, how to identify the issuing body and routes for checking an accredited certificate.

If you are still unsure

The ISO guide links to certificate-verification routes. If a register does not show the certificate, confirm it with the issuer rather than treating the search result as conclusive.

Link to question 9.1 ↗Your issued form · page 5

If more detail is needed

For the relevant work only. These are not extra questions in the initial registration.

Quality requirements for particular work+

The addendum or accepted supply contract identifies the relevant standard, edition, quality clauses and acceptance criteria. Evidence may cover certificate scope, the quality plan, traceability, change control, nonconformities, concessions, counterfeit prevention, inspection, calibration and agreed audit or Government Quality Assurance rights.

Ask for exact requirements and supplied documents. A certificate alone does not establish every AQAP or work-specific obligation.

How to use the addendum →
Passing requirements to approved sub-tiers+

Flowdown means putting the identified obligations relevant to the outsourced work into the sub-tier contract and retaining acceptance and assurance evidence. Obtain required consent before the affected activity. You remain responsible for subcontracted performance.

Do not copy every unseen prime-contract clause or assume a named subcontractor is automatically approved.

How to use the addendum →
Before you move on

The agreed specification and quality duties apply under 13.6. Required concessions and permissions must be obtained before use, delivery or outsourcing.

Have these ready

  • Current certificate or verification reference, if held.

Further reading

Start with the practical help beside each question. These official sources explain the underlying rules if you need more detail.

MODJSP 940 quality policy, Part 2↗ (opens in a new tab)

The signed agreement and identified work-specific schedules determine the obligations. Official guidance explains their legal or contractual basis.

When to use an addendum →
← Previous08 Insurance and financial standingNext →10 Data protection

This guide explains form v2.0. It does not amend the issued requirements or approve work, exceptions or information release. Use the external help to find records and understand the rules. For questions about RCDEN's requirements or the proposed work, use the contact in Section 1.2 and quote the question number.

RCDEN

RCDEN | INTELLIGENT UNMANNED SYSTEMS

sales@rcden.co.uk ↗
Follow RCDENLinkedIn ↗ (opens in a new tab)Facebook ↗ (opens in a new tab)
THE RC DEN LTDRegistered in England and Wales · Company no. 14639255Customer-facing workshop: Unit 8, Blackwood Court, Teal Park, North Hykeham, Lincoln, LN6 3AERegistered office: Unit 8 Blackwood Court, Lincoln, England, LN6 3AE
HomeServicesTechnology partnersAboutAssuranceNewsEngineering resourcesRSS updatesPoliciesContactInvestor informationBrand guidePrivacy & cookies

Supplier guidance · Form v2.0 · Reviewed 08 September 2026

© 2026 THE RC DEN LTD